The Business Magazine - B2B Business News - Site Logo

Warning: Undefined array key "tbm_visit_edition_me" in /home/970822.cloudwaysapps.com/utkbfqnuhr/public_html/wp-content/plugins/oxygen/component-framework/components/classes/code-block.class.php(133) : eval()'d code on line 27
The Business Magazine - B2B Business News - Site Logo
The Business Magazine May 2024
Read now
PICK YOUR EDITION

Greendale Construction completes luxury Wiltshire cottage and workshops

The Business Magazine article image for: Greendale Construction completes luxury Wiltshire cottage and workshops
The Greendale team at Trafalgar Cottage, from left - Pete Marks, Neil Drissell, Chris Varga-Loader and Chris Riddle
1 July 2024
The Greendale team at Trafalgar Cottage, from left - Pete Marks, Neil Drissell, Chris Varga-Loader and Chris Riddle

Poole-based Greendale Construction has finished a contract to turn a dilapidated building into a luxury four double bedroom holiday cottage near Downton, Wiltshire.

The 42-week works involved major structural alterations after it was discovered that all existing walls were unconnected.

A steel frame was installed in the rear to tie the walls and support the new first floor; the front walls were tied with HeliBar; and a damp membrane system was added to all solid walls, metal stud and insulation lined prior to plastering.

The pitched roofs were completely replaced due to the amount of rot, and a loft conversion to create a split-level floor for the stunning master suite to the front of the cottage which also boasts a dressing area, as well as two further double bedrooms.

A single-storey side extension was built to form the living room, with aluminium sliding doors leading out onto the patio terrace and garden.

The cottage has also gained a new window and external doors, as well as a total internal fitout which includes a new main bathroom and shower room. 

Meanwhile, building the workshops involved the total demolition of a rotten timber structure and rebuilding of various areas of damaged brickwork to plinths.

New timber studwork frames with timber posts, glulam beam & roof purlins were installed, with new insulated corrugated roofing sheets, lead work to the rear wall, and a rebuild of brickwork capping.

The workshops also benefit from a new toilet and sink, as well as new electrics.

Rob Hooker, director of Greendale Construction commented: “This has been a very rewarding project in a beautiful and quite unique location.

“The transformation from start to finish has been extraordinary.

“Thanks go to our client, the design team and our brilliant contracting team in delivering this amazing project.

“We’re now excited to be working the next large phase of the piggeries and holiday let section.”


Share 

Born and raised in Berkshire, Dan fell into journalism after completing his bachelor’s degree in English at UCL.

Writing for The Business Magazine and local Biz News sites has given him the opportunity to chat with all manner of small business owners and share their success stories with a wider audience.

Outside of work, Dan enjoys live music, board games and quiz shows, and is making a slow but persistent effort to learn Spanish.

Latest deal ticket

All deals
  • IT provider Daly Systems (Leicestershire)
    has been acquired by
    Telecoms provider Onecom (Hampshire)
    June 2024
    UNDISCLOSED
    Who's behind the deal?
  • Water consultancy Waterscan (West Sussex)
    has received investment from
    Private equity firm LDC (London)
    June 2024
    £12m
    Who's behind the deal?
  • Bluewater Shopping Centre (Kent)
    has sold an additional stake to
    Property investor Landsec (London)
    June 2024
    £120m
    Who's behind the deal?

Events

All events

Related news


Group Titles

Dorset BIZ NewsHampshire BIZ News
cross